Welcome aboard the
DD-782



Download a larger version of the
USS ROWAN DD-782


Built by Todd Pacific Shipyards; Inc., Seattle, Wash.

Keel was Laid down on - 25 March 1944
Launched - 29 December 1944
Commissioned on - 31 March 1945; Comdr. W. A. Dunn in command.
Status Changed in 1977 - Disposed of through the Security Assistance Program
Custodian was to be - Taiwan; however on 22 August 1977 while under tow to Taiwan she sank.
Machinery
Main Engines - 2 Geared Turbines (General Electric or Westinghouse) 60000 shp 2 Shafts
Boilers - 4 (Babcock & Wilcox or combination Babcock & Wilcox and Foster Wheeler)
Displacement, tons 2,425 standard, 3,480 to 3,520 full loaded Lenghth - 390' 5"
Beam - 40' 9"
Draft - 19'loaded 18' 6" as launched
Speed 35 knots
Range - 5,800 nautical miles at 15 knots
Complement 336

Armament Design (as built)

Armament Design (after WW2)

Armament Design (after FRAM 1)